# BOI Investment Promotion The project will apply for promotion by the Thailand Board of Investment. Research snapshot from July 2026, based on the BOI Investment Promotion Guide 2025/2026 and advisory sources; BOI revises its measures roughly annually, so every scheme cited here must be reconfirmed at filing time. The exact activity sub-code needs confirmation by a BOI-registered consultant before the application. ## The strategic picture Vinyl pressing is, in BOI terms, basic plastic consumer-goods manufacturing (Category 6, chemicals/paper/plastics), which lands in **incentive Group B**: no corporate income tax holiday on the core pressing activity, but the full non-tax package and machinery duty exemption. The tax value is engineered on top through the upgrade measures, where this project happens to be strong: - **Solar: no longer promoted; the battery may be.** The alternative-energy measure (Announcement 2/2568, April 2025, under the Smart and Sustainable Industry framework) granted a CIT exemption on the solar investment, capped at THB 12M/30M/40M per MW. **Announcement 3/2568** (5 June 2025, in force 1 July 2025) ended promotion for installing solar power generation under that measure for applications from 1 July 2025; what remains is machinery modified to use other renewable energy, and battery storage (BESS) with its inverters, the eligible investment capped at THB 12M per MW ([B Global Law](https://bgloballaw.com/2026/01/18/boi-announcement-no-3-2568-amendment-to-renewable-energy-efficiency-enhancement-measures), [Smarter Energy Solution](https://smarterenergysolution.com/blog/boi-solar-thailand-2026), checked October 2026). So owning the ~520 kWp factory-roof array earns no BOI benefit; its case is the bill (see [sustainability](sustainability.md)). Whether the 271 kWh battery qualifies is for the BOI consultant. A PPA developer selling solar power (200 kW or more per distribution point) can still be promoted under activity 7.1.2 (8-year CIT exemption); that benefit is the developer's, and how much of it reaches the PPA price is a negotiation ([CapSolar](https://capsolar.co.th/en/knowledge/boi-solar-incentives-2026)). - **Automation and metrology**: the Smart and Sustainable Industry upgrade measure (Announcement 15/2565, refreshed July 2025) rewards automation, smart machinery, and energy efficiency, typically 3 years of CIT exemption capped around 50% of the qualifying upgrade investment. The automated presses, inline optical inspection, and stamper metrology are the natural fit. - **R&D merit**: investing at least 1% of revenue in Thai R&D adds 1 to 3 CIT-exemption years and can lift the exemption cap. In-house mastering, galvanics process development, and recycled-PVC work could be framed as qualifying development. So the application is pitched on automation and technology content (and the battery, if it qualifies), not on "we press plastic discs." ## What Group B still delivers (the core value) - **Machinery import duty exemption**: significant with the entire equipment list imported (Germany, Sweden, USA, Japan). **Import VAT goes with it:** machinery or raw material imported with the duty exemption is exempt from VAT at import as well (Revenue Department answer on the [BOI OSOS FAQ](https://osos.boi.go.th/One-Stop/faq-group/205/FAQ-about-VAT--BOI), checked October 2026); otherwise a BOI company is treated like any other for VAT. What it is worth: the capex blocks in [total investment](finance/total-investment.md) are vendor prices without duty or VAT, so they already assume promotion. Without it, the ~2.3M USD of imported machinery in the launch plant (presses, galvanics line, Sibert, cutting room, metrology; block midpoints, as [total investment](finance/total-investment.md#launch-plant-october-2026) states it) would carry import duty, roughly 5 % (Thailand's MFN averages 4.1 % on HS 8477 plastics machinery, 0 to 10 % across HS 84; estimate until the HS codes are set), ~0.11M USD, and 7 % import VAT, ~0.17M USD paid at the border and only recovered later as input tax, mostly as a refund claim because exports are zero-rated. The [plant and business plan calculator](fleet-calculator.html) shows both cases; its BOI switch also counts the water treatment (ZLD/DI) as imported, ~2.5M USD at the midpoint (figures re-based October 2026; the earlier ~2.75M was the superseded start fleet). - **100% foreign ownership** of the promoted manufacturing company, overriding Foreign Business Act restrictions for the promoted activity. The intended split: the main investor holds at least 60 %, at most 40 % goes to co-investors (user, October 2026; [total investment](finance/total-investment.md#two-plans-a-at-180m-thb-and-b-at-215m-thb-october-2026)) - **Land ownership** for the promoted operation despite foreign shareholding, plus a small allowance for office/residential use; note the privilege is tied to the promotion, which matters for the buy-vs-lease decision - **Visas and work permits** via the One Stop Service, without the usual four-Thai-employees-per-permit rule; relevant for foreign commissioning engineers and the technical consultant - **Raw material duty relief**: exemption for export production (1 to 5 years, renewable) and up to 90% reduction for domestic-sale production ## Requirements - Minimum investment THB 1,000,000 excluding land and working capital (comfortably cleared by the first pressing line alone) - Debt-to-equity ratio no higher than 3:1, maintained for the life of the privileges; plan the equity/loan mix for the machinery and solar capex accordingly - Modern machinery and process expected; ISO/environmental compliance for larger projects - BOI promotion does not replace the factory license (Ror.Ngor. 4), hazardous substance registration, or wastewater permitting; the galvanics effluent is the most likely regulatory friction point regardless of BOI status ## Regional angle: Northern Thailand Chiang Mai, Lamphun, and Lampang sit in the **Northern Economic Corridor**, which BOI promotes as a creative-economy base; a vinyl/music manufacturing story fits that narrative. Locating in the **Northern Region Industrial Estate in Lamphun** simplifies factory licensing and land questions and provides shared central effluent treatment, which helps the galvanics permitting. Legacy "Zone 3" incentive tables still found online are outdated; the current area-based add-ons for Lamphun/Lampang must be confirmed with BOI directly. ## Process and timeline 1. File via the BOI e-Investment system, then present the project at an analyst meeting 2. Decision: about 40 working days for projects under THB 200M (60 to 90 working days for larger tiers); roughly 4 to 6 months end to end to the promotion certificate in practice 3. Incorporate the company (if not yet done) and accept the certificate 4. Import machinery within the duty-exemption window, commonly 30 months from certificate issuance (extendable); the Newbilt/Pheenix delivery schedule must fit inside it 5. Reach full operation by the certificate deadline (typically about 36 months), with progress reporting, annual reports, machinery lists, and the 3:1 debt-to-equity ratio maintained throughout ## Sequencing consequence BOI approval comes **before** company incorporation is finalized and before any machinery purchase orders: duty exemption does not apply retroactively to equipment already imported, and the certificate defines the import window. The BOI application is therefore a dependency at the top of the project timeline, ahead of equipment contracts. ## Open items - Confirm the exact activity sub-code and tier for vinyl/PVC consumer-goods pressing (Group B assumption is well supported but not code-verified) - Confirm the live version of the smart-and-sustainable measures at filing time, and whether the battery qualifies under the BESS part of the alternative-energy measure (THB 12M per MW cap); solar itself is out since 1 July 2025 (Announcement 3/2568) - Confirm current NEC/Lamphun area add-ons - Engage a BOI-registered consultant to structure the application so the automation and R&D measures (and the battery) stack on the base promotion - Check whether R&D contracted with Payap University and the joint student programmes ([Payap partnership](payap-partnership.md)) count toward the R&D merit or a skills-development measure - Keep any future label/content/retail arm in a separate entity: media and service activities carry different (and sometimes Thai-ownership) conditions, and mixing them muddies a clean manufacturing application