# Biomass Fuel Strategy If the steam boiler goes the biomass route (see the options in [sustainability](sustainability.md) and the Getabec candidate in the [utilities CSV](finance/utilities-investment.csv)), the fuel comes from two sources: the team's own 60 rai of currently unused land, and northern Thailand's agricultural waste market. Figures below are planning estimates, plus or minus a wide margin, to be refined against the actual boiler choice and duty cycle. ## Demand: what the boiler would burn The 400 kg/h boiler is roughly 300 kW thermal at full fire. With the heat recovery architecture trimming the load and realistic duty cycles: - Mature plant (semi-auto plus automated lines, two shifts, ~300 days/yr): roughly **350 to 400 tonnes of air-dry wood per year** (at ~80% boiler efficiency and ~4 kWh/kg air-dry wood) - Early operations (one press line, single shift): roughly a quarter of that, **~90 to 100 t/yr** ## The 60 rai: own-grown fuelwood 60 rai is 9.6 hectares. Managed as short-rotation coppice (planted once, harvested on a 2 to 4 year cycle, regrowing from the stump), fast species proven in Thailand (eucalyptus, acacia, leucaena, bamboo) yield roughly 8 to 14 air-dry tonnes per hectare per year. So the land can sustainably supply about **80 to 135 t/yr**: - Enough to cover **most or all of early operations** - About **a quarter to a third of mature two-shift demand** That makes the land a meaningful supplement and a strong brand story ("records pressed with steam from our own trees"), not a complete fuel supply. ### The classification check comes first The land is currently classified as forestry, and in Thailand that carries legal weight. Before a single tree enters the fuel plan: - Verify the parcel's actual status: clean Chanote title vs Sor Por Kor vs National Forest Reserve. Planting, harvesting, and transporting trees, even self-planted ones, can be restricted depending on classification, and some species are restricted regardless. - If eligible, register the plantation under the forest plantation framework, which legalizes grow-and-harvest cycles and the transport paperwork. - If the parcel carries actual standing forest, it should not be harvested for fuel: that would undercut the sustainability commitments the plant is built on. Coppice belongs on the degraded or empty portions. ## Filling the gap: the northern biomass market The region fills the remainder easily and cheaply: - **Longan orchard prunings**: Lamphun is Thailand's longan heartland and prunings are an established traded fuel - **Sawmill and wood-processing residues** - **Corn cobs and rice husk**: abundant regional crop wastes; a Getabec-class solid-fuel boiler is designed for exactly this fuel mix - Buying from local farmers also strengthens the local-sourcing story that already runs through packaging and PVC ## Logistics on site To reflect in the facility planning: a fuel storage shed (biomass must be kept dry; monsoon-season storage sizing matters more than dry season), chipping for coppice wood, ash handling, and the emissions stack that comes with solid fuel. These are the capex/opex adders that the biomass premium in the utilities CSV (roughly 4M to 7M THB for the boiler package vs 2.5M to 4M electric/gas) partially reflects; fuel handling and storage are additional. ## Decision framing - Biomass makes the steam genuinely renewable and pairs with cheap northern fuel, at the cost of higher capex, fuel logistics, ash, and an emissions point - The 60 rai tilts the economics and the story further toward biomass, but only after the land-title check clears - The electric boiler remains the alternative: cleanest permitting, no fuel logistics, but effectively grid-powered steam at a ~300 kW draw. On PEA's time-of-use tariff that costs ~4.7M to 5.5M THB a year at mature load against ~0.35M to 0.8M of fuel for biomass, and ~1.4M to 1.7M against ~0.1M to 0.2M at early load, because the demand charge follows the boiler's full-power draw (estimates; see the [grid tariff](sustainability.md#grid-tariff-pea-and-what-it-decides)). The electric boiler is the more efficient machine; biomass is the far cheaper heat - A staged path is possible: start electric (fast, clean permitting), plant the coppice now (first harvest in 2 to 4 years), and add the biomass boiler at the automated-line expansion when demand and the fuel supply have both matured. At the tariff above that is a permitting and logistics choice, not a cost one: every year on electric steam costs roughly 1.2M to 5M THB more than biomass, so the switch should come as soon as the permit and a fuel contract are in place