# CNX Vinyl / Poy Records A vinyl record factory in planning for the Chiang Mai area of northern Thailand (site candidates include Lamphun and Lampang provinces). This repository is the source of truth for the project: planning documents and cost data today. As the factory takes shape it will also hold the data and software used to run it. ## Team - **Simona Meesaiyati**, Project Lead - **Alexander Grabowski**, Technical Consultant [buildfor.life](https://buildfor.life) supports the project in a consulting capacity. ## Vision: Full-Service Production The goal is the complete vinyl production chain under one roof, from audio file to delivered record: 1. **Mastering**: audio mastering for vinyl 2. **Lathe cutting**: cutting the master disc 3. **Silvering**: metallizing the cut master 4. **Stamper production**: electroforming nickel stampers in-house 5. **Pressing**: extrusion and pressing of the finished records 6. **Finishing**: trimming, labels, shrink wrapping 7. **Packaging**: folded paper cartons (jackets and sleeves), produced in collaboration with local packaging manufacturers 8. **Fulfillment**: dropshipping directly to end customers on behalf of labels and artists, alongside conventional bulk delivery In-house galvanics (steps 3 and 4) removes the dependency on overseas stamper suppliers, a common bottleneck for pressing plants, and shortens turnaround for clients. Partnering with local carton manufacturers keeps packaging sourcing close to the plant, in line with the local-sourcing preference for materials. The pressing line is documented in detail; equipment, partners, and budgets for the other steps are open planning items. ## Project Status **Planning stage** (as of mid-2026). - Industry outreach has been ongoing for several years: equipment vendors, material suppliers, and independent consultants. - Alexander and Simona will soon travel to [Making Vinyl](https://makingvinyl.com/) in Haarlem, Netherlands, to gather further insights from the pressing industry. - A collaboration with [Resurrec](https://www.resurrec.com/) is under discussion. ## Planning Documents The detail lives in dedicated documents: - [Pressing line equipment plan](docs/equipment/pressing-line.md): the 50/50 automated/semi-automatic fleet strategy, the Newbilt system under evaluation (≈ €200,500 quoted scope), and site requirements - [Vendor landscape](docs/suppliers/vendor-landscape.md): researched candidates for mastering and cutting (Agnew Analog), galvanics equipment (Plating Power / Digital Matrix), stamper preparation (Sibert), bridge stamper service (Stamper Discs), and automated presses (Pheenix Alpha) - [Equipment needs and supplier map](docs/suppliers/equipment-suppliers.md): the full needs list per production step with supplier tables and contacts - [Sustainability](docs/sustainability.md): the solar installation (Deye inverters, 271 kWh Gobel Power battery stack), the zero contaminated water commitment, and the materials strategy - [Worker safety](docs/worker-safety.md): safety training, galvanics clean rooms and decontamination, PPE - [Biomass fuel strategy](docs/biomass.md): the 60 rai own-grown coppice idea (with the forestry-classification check that comes first), northern agricultural waste as the main supply, and the staged electric-to-biomass path - [BOI investment promotion](docs/boi.md): the promotion strategy (Group B base activity plus solar, automation, and R&D measures for the tax value), requirements, Northern-region angle, and why BOI approval precedes machinery orders - [Facility security and site systems](docs/facility-security.md): access control, CCTV, whole-factory HVAC (temperature, humidity, PM), archive and audio protection, fire and life safety, plant monitoring, Thai compliance anchors - [Process logging and traceability](docs/traceability.md): end-to-end per-order traceability for customers, batch genealogy from audio file to shipment, and the requirements this sets for the factory software - [Quality automation](docs/quality-automation.md): stamper metrology (Keyence-class confocal, profiler, XRF), layered pressed-record QC (100% optical inspection, per-cycle press telemetry, sampled automated audio comparison), and how it feeds traceability - [Process flow](docs/process-flow.md): the whole chain from audio file to delivered record as a chart and stage table, with every check and the three artist approval gates (printable diagram alongside) - [Project scale](docs/scale.md): rough numbers for everything on one page: output capacity, building area, land, electrical demand, solar and storage, steam and fuel, headcount, and money cross-references - [Total investment](docs/finance/total-investment.md): the full-vision roll-up (~4M to 7.7M EUR) and the ~1.5M to 2.5M EUR phased entry, with the basis of every block - [Revenue model](docs/finance/revenue-model.md): rough full-capacity revenue (~3.2M to 5.9M EUR/yr), direct cost and margin per record, and the levers and caveats behind the numbers ## Repository Layout ``` docs/ ├── consulting/ Consultancy proposals and overviews ├── equipment/ │ ├── newbilt/ Offers, site requirements, process schematic, │ │ service rates (vendor PDFs) │ └── pressing-line.md Press fleet strategy and equipment plan ├── finance/ Project cost overviews ├── suppliers/ Supplier contacts, vendor landscape, supplier map ├── biomass.md Biomass fuel strategy and the 60 rai coppice idea ├── boi.md BOI promotion strategy and requirements ├── facility-security.md Security, HVAC, fire and life safety, compliance ├── process-flow.md Audio file to delivered record, with all checks ├── quality-automation.md Stamper metrology and layered record QC ├── scale.md Rough project sizing on one page ├── sustainability.md Energy, water, materials commitments ├── traceability.md Process logging and per-order traceability └── worker-safety.md Training, clean rooms, PPE ``` Vendor PDFs and spreadsheets are primary sources and reflect the state of negotiations at their file dates. Treat prices and lead times as snapshots, not commitments. ## Roadmap for This Repo - Accumulate planning and vendor documents as decisions firm up, including the mastering, cutting, and galvanics chain - Add structured data (inventory, orders, production batches) once operations begin - Host the software/tooling built to run the factory (tracking, ERP-style workflows)