From 89da2af9c33bd5a4824eb5d445baa42ac6b24ae4 Mon Sep 17 00:00:00 2001 From: grabowski Date: Fri, 17 Jul 2026 17:46:27 +0700 Subject: [PATCH] Add total investment roll-up: 4M-7.7M EUR full vision, 1.5M-2.5M EUR phased entry All sums and conversions reviewer-recomputed; every block carries its basis (quote, researched range, or marked estimate) --- README.md | 3 ++ docs/finance/total-investment.md | 60 ++++++++++++++++++++++++++++++++ 2 files changed, 63 insertions(+) create mode 100644 docs/finance/total-investment.md diff --git a/README.md b/README.md index 6e80d81..02f8714 100644 --- a/README.md +++ b/README.md @@ -92,6 +92,9 @@ The detail lives in dedicated documents: - [Project scale](docs/scale.md): rough numbers for everything on one page: output capacity, building area, land, electrical demand, solar and storage, steam and fuel, headcount, and money cross-references +- [Total investment](docs/finance/total-investment.md): the full-vision + roll-up (~4M to 7.7M EUR) and the ~1.5M to 2.5M EUR phased entry, with + the basis of every block ## Repository Layout diff --git a/docs/finance/total-investment.md b/docs/finance/total-investment.md new file mode 100644 index 0000000..83cddbb --- /dev/null +++ b/docs/finance/total-investment.md @@ -0,0 +1,60 @@ +# Total Investment: Rough Picture + +Everything priced or estimated so far, rolled into one view. Blocks marked +"estimate" have no vendor confirmation; the rest trace to quotes or the +researched ranges in this repo. Treat all figures as budgetary with a wide +margin (plus or minus 30 to 50% on the estimates) until RFQs replace them. +FX: ~38 THB/EUR. Compiled July 2026. + +## Full vision, all blocks + +| Block | Low (EUR) | High (EUR) | Basis | +|---|---|---|---| +| Newbilt semi-auto line, full Duplex | 300,000 | 320,000 | 2024 quote 200,500 + quoted 2nd press/extruder ~100,000; expired, needs re-quote | +| 2 automated presses (Pheenix AD12) | 500,000 | 800,000 | unverified ~$340k/press indicative + delivery and commissioning | +| Galvanics line (Digital Matrix) | 280,000 | 560,000 | six-figure-USD turnkey inference from vendor research | +| Zero-discharge water treatment (ZLD) | 80,000 | 210,000 | utilities CSV option row, 3-8M THB | +| Stamper prep (Sibert VSP, VSF, VSC) | 50,000 | 150,000 | estimate, pricing unpublished | +| Mastering and cutting room (Agnew lathe and head, cutter amps, console, room treatment) | 250,000 | 500,000 | estimate, bespoke market | +| Metrology and QC stack (confocal, profiler, XRF, inline vision, audio station) | 300,000 | 700,000 | estimate, phaseable | +| Utilities, solar, HVAC, racking baseline | 630,000 | 1,100,000 | reviewed utilities CSV, 23.98-41.63M THB | +| Building ~1,500 m² plus civil works | 560,000 | 950,000 | estimate at 12,000-20,000 THB/m² Thai industrial construction plus ~20% site works | +| Land 6-8 rai, if purchased | 315,000 | 840,000 | estimate at 2-4M THB/rai industrial; leasing cuts this to near zero upfront | +| Traceability and factory software | 50,000 | 150,000 | estimate | +| Freight, installation, training (non-Newbilt equipment) | 100,000 | 200,000 | estimate | +| Working capital, PVC stock, spares | 100,000 | 200,000 | estimate | +| Subtotal | ~3,500,000 | ~6,700,000 | | +| Contingency 15% | ~500,000 | ~1,000,000 | | +| **Total, full vision** | **~4,000,000** | **~7,700,000** | **~150M to 290M THB** | + +## Phased entry + +A credible launch phase is far smaller, roughly **1.5M to 2.5M EUR**: + +- Newbilt Single system (not Duplex yet) +- Bridge stampers from Stamper Discs, so no galvanics line at launch +- Basic QC (microscope, benchtop PVC lab, sampled listening), full + metrology deferred +- Leased building instead of purchase, modest first solar array +- Galvanics, automated presses, full metrology, and the biomass boiler + follow as revenue-funded or second-round expansions + +The planning already supports this: the Duplex-ready hydraulics, the +bridge-supplier role for Stamper Discs, the staged electric-to-biomass +steam path, and the phaseable metrology stack are all documented for +exactly this reason. + +## What moves the number + +- **BOI**: machinery duty exemption applies across most of the equipment + blocks, and the solar and automation spend converts into CIT-exemption + headroom; the application precedes every purchase order (see + [boi.md](../boi.md)) +- **Buy vs lease** on land and building swings roughly 0.9M to 1.8M EUR of + upfront capital +- **Biggest uncertainty bands**: metrology (partly a choice of ambition), + the mastering/cutting room (bespoke vendor, no public pricing), the + automated presses (single unverified price point), and land +- Every band narrows only with RFQs; the supplier map in + [equipment-suppliers.md](../suppliers/equipment-suppliers.md) lists who + to ask