CNX Vinyl · Steam and cooling plant · five-press fleet · proposed concept

Concept for the RFQs, not a construction drawing. Machine figures are Newbilt's published site requirements per press, extruder and hydraulic unit; boiler and chiller banks, tank sizes and pump duties are this repository's proposals and estimates until vendors quote. Click any piece of equipment.

Click any equipment

Each box explains what it does, the figures behind it with their source, and what the RFQ still has to settle. The buttons above switch between operating cases: which presses run, which modules are installed, and whether the plant covers the demand.

Design basis

ItemFigureSource
Fleet2 Duplex systems (4 HRP 12, 2 EX 50, 2 EX 35) + 1 Classic with built-in extruder; one central hydraulic and one air plantpressing-line.mddoc
Steam per press150 to 180 kg/h, min. 10 bar, 9.5 to 10.5 bar operatingNewbilt site requirements 3.2.3vendor
Press cooling waterup to 100 l/min, ~53 l/min used, in 20 to 25 °C at 10 bar, out ~60 °C, max. 2 bar (open)site requirements 3.2.2vendor
Press cooling capacityup to 125 kW per press, by cycle timesite requirements 3.2.2vendor
Extruder cooling~4 l/min, 2 to 3 kW, in 20 to 25 °C, 5 to 10 barsite requirements 3.3.3vendor
Hydraulic oil cooler~8 l/min, up to 5 kW per aggregate (2.5 kW per press)site requirements 3.4.2vendor
Cooling water quality7 to 8 °dH, pH 7 to 9, ≤ 200 µm, ≤ 500 µS/cm, Cl ≤ 20 mg/lsite requirements 3.1.2vendor
Classiccounted as one HRP 12 + one extruder; Toolex Alpha cross-check 1.2 kg steam, 15 l water per cyclefleet calculatorestimate
Five presses, full demandsteam 750 to 900 kg/h · cooling 652.5 kW · water 305 to 540 l/minsum of the abovedoc
Chiller electrical input~80 to 125 kW per 250 kW of cooling (air-cooled, hot season)scale.mdestimate
Electric boiler alternative~0.68 kWh per kg of steam at 98 %fleet calculatorestimate
Annual steam heat~1,170 MWh at 1.0 M records, ~1,750 MWh at the start fleet's full ~1.5 Mfleet calculator, biomass.mdestimate

Circulating water is not consumption: the loop recirculates. Boiler make-up is about 0.75 to 0.9 m³/h before condensate return, much less with it.

Equipment schedule (proposed)

TagItemDutyPhaseStatus
WT-1Duplex softener, dosing~1.0 to 1.2 m³/hlaunchestimate
T-1Feed tank / hotwell~1.5 m³, 90 to 95 °Claunchestimate
P-1Feed pumps, duty/standby~1 m³/h, ~13 barlaunchestimate
B-1, B-2Boiler modules, lead/lag2 × 500 kg/h, 10.5 barB-1 launch, B-2 with Duplex 2proposal
B-3Third module for N+1500 kg/hoption; position built at launchRFQ option
B-4Fourth position: pad, header branch, feeder500 kg/hgrowth, ~3 more pressesposition only
ECON-1Flue-gas economizer, fired boilersfeed in 90 to 95 °C, out by vendorwith a fired bank1st measure
ACC-1Steam accumulatorby cycle overlapoptionNewbilt option
HP-1Heat-recovery heat pumpfeed tank to 90 to 95 °Cif it pays3rd measure
CH-1 to CH-3Air-cooled chillers at 40 °C ambient3 × 250 kWone per press stageproposal
CH-4Fourth module for N+1250 kWoption; pad built at launchRFQ option
HX-1Plate heat exchanger~650 kW, ~2 K approachlaunch: frame for 5, plates as presses arriveestimate
TK-3, TK-2Warm return / cold buffer tanks~5 m³ eachlaunchestimate
P-2, P-3, P-4Transfer, VFD supply, primary pumpsup to ~540 l/minlaunch, stagedestimate
TC-1Dry cooler ahead of HX-1~650 to 750 kW rejectoptionRFQ option
GCGalvanics cooling, separate12 to 20 °C, 10 L/min per PDPUphase 5open

Phasing: backbone once, modules with the presses

Everything that is cheap to oversize now and costly to change in a running plant is built for the five-press fleet at launch; boilers, chillers and hydraulic pump sets come in identical modules as presses arrive. One controller sequences them lead and lag from the first module.

StageSteamCoolingHydraulics, air
Launch (Single 2.1, one press)hall for four modules; T-1, WT-1, P-1; mains with a valved, blanked branch per press position; B-1compound with four pads; TK-2, TK-3 full size; HX-1 frame for ~650 kW, plates for one press; P-2 to P-4 on VFDs; CH-1plant room full size; ring mains for the fleet, a capped tee per position; the Single 2.1 unit as the first pump set; one compressor
Duplex system 1B-1 at 60 to 72 % loadCH-1 covers ~96 % of the peak: cold tank and cycle overlap, or CH-2 earliertap the ring main
Duplex system 2B-2CH-2pump set on the manifold
ClassicB-1 and B-2CH-3pump set, if the Classic runs from the central plant
OptionsB-3 (N+1), B-4 (growth), ACC-1, ECON-1CH-4 (N+1), TC-1, pads for ~350 kW unitsstandby pump set

Rooms, four modules each (estimate)

RoomSizeBasis
Boiler hall~18 × 9 m, 6 m highfour 3.5 m bays plus 4 m for T-1, WT-1, P-1 and the header; fired case (500 kg/h biomass body ~3.3 × 2.0 m); electric needs about half
Chiller compound~12.5 × 10.8 m, openfour pads 4.0 × 2.6 m in two rows, screened; 250 kW at 40 °C is about a Carrier 30RB 080 to 090, 2.4 to 3.6 × 2.24 m
Pump and HX room~8 × 5 mHX-1, TK-2, P-2 to P-4, drives

Four boilers carry about eight presses with one in reserve. Four 250 kW chillers carry the five presses with CH-4 in reserve and leave no growth position, unless the pads take the larger frame (scale.md).

Open for the RFQs

Newbilt (re-quote)

Boilers (Miura, Bangkok Industrial Boilers, STE)

Chillers (Trane, Carrier, Daikin Applied, Hitachi)

Site

Legend

Saturated steam 10 bar
Condensate return
Treated feedwater
Raw / make-up water
Process cooling supply 20 to 25 °C
Process cooling return, open
Chiller loop, cold
Chiller loop, warm
Heat recovery feedwater loop
Blowdown, drains
Flue gas
°CTemperature, Newbilt figure
°CDesign target or estimate
TBDSet by the vendor or by measurement

Dashed boxes are options. Bow-ties are isolation or control valves (a stem marks a control valve), squares strainers, T a steam trap. Circles are instruments: PT pressure, TT temperature, FT flow, AT conductivity (off-spec condensate goes to the warm tank); every one is logged to the plant data platform (digital-factory.md). Flow times supply and return temperature on each branch gives that press's cooling load; steam flow against records pressed gives steam per record.